Calculate the date your usable stock will run out, then use current prices and confirmed lead times to decide how much to reserve. Starch and whole flour prices can move in different directions within the same producing region.
1. Separate surveyed stocks from the two ex-factory prices
Mysteel reported 66,000 tonnes of potato starch in stocks at 20 major producers as of 19 November, up 6,700 tonnes on the previous week. The survey total does not show what share of that stock was committed to other buyers.
On 27 November, Xinhua Index reported a Dingxi potato starch ex-factory price of CNY 6,025.22/t, down 0.43% from CNY 6,051.30/t on 20 November. Whole potato flour held steady at CNY 10,087.00/t.
2. Why a buyer can wait for stock while mill inventories rise
Mill stocks span grades, lots and pack formats. Your required specification may already be allocated. Ask how much the supplier can release for this order, when it can leave the mill and when it will arrive. Operating rates alone cannot establish a mill’s price expectations.
3. Size the next order by days of cover
Divide released stock suitable for the formula by expected daily consumption. List confirmed inbound lots separately by arrival date to identify any production gap.
| Current cover | Possible purchasing action |
|---|---|
| Under 30 days | Reserve the shortfall through the replenishment lead time and confirm lots available for dispatch. |
| 30–60 days | Cover committed orders first, then phase the balance against demand and vessel bookings. |
| Over 60 days | Check shelf life and space, then negotiate split arrivals and payment terms. |
4. Work backwards from the pre-holiday production plan
Allow time for testing, staging, inland transit, port cutoffs and destination clearance on each route. Use the forwarder’s confirmed cutoff. For the first new-season delivery, leave time to compare viscosity, whiteness and moisture against the previous lot before switching production.
Frequently asked questions
Can rising surveyed stocks justify a smaller order?
Check the volume available in your grade and its confirmed arrival date against the production shortfall.
Can I use Dingxi ex-factory prices as a delivered quote?
Freight, packing, grade, taxes and delivery terms affect the amount payable on a particular order.
Are 30 and 60 days fixed purchasing thresholds?
These bands are planning examples. Adjust for replenishment lead time, variability in consumption and available storage.
Purchasing resources
- Procurement white paper
- Pre-holiday shipping dates
- Native potato starch
- Fries selector
- Pregelatinized whole flour
- Minitubers
- Technical specifications
